Report QA

Cycle / Ridge Heating, Cooling, Plumbing Electrical / Order lines
build 2026.08.26-81 · bdc0c15

Order lines as stored

Every row Ridge Heating, Cooling, Plumbing Electrical's 2026-07 report is judged against - not the summary a finding prints, the actual rows. Would be is what today's code would map the raw product name to; where that differs from Product, the row was written by an older import and that is the whole answer.

These rows were written by older import code. Last read Aug 26 at 8:42 AM ET with map f798eef3de4fec4e; the code running now is 94d7d480dcbfa276. The product check abstains while that is true.
ProductWould beRaw name on the order OrderLine itemsLive Ran in 2026-07Flights Impressions
a month
Budget
a month
Ad spend
CTV CTV Connected TV Ads 55056 133397 yes yes 2026-07-07 → 2026-12-31 25,000

Flights: none recorded means the row predates build 42, which is when each order's own window started being kept. Until it is re-read, the period test falls back to the merged span and a gap between two flights is invisible.